DCP03362.JPG (75125 bytes)    August 26, 2005 - Friday - Before mudding and taping can start in earnest, the entire floor of the home must be covered with paper to prevent a large mess all over our wonderful slab floor.  This shot, taken from the dining area, shows the floor paper installed in the living room.  This paper is very robust and should easily last for weeks.  Since we will also texture the walls, this paper will protect the floor from texture splatters and also from paint drips when we paint.

DCP03363.JPG (62511 bytes)    August 26, 2005 - Friday - Mudding and taping started this week.  This picture shows the first layer of mud in the north east bedroom.  The start of a very long process!